Street sweeping has eliminated 1360 cubic
yards of debris from city streets.
Street waste collection baskets eliminated
an estimated 9,000 cubic yards of debris.
Storm water catch basin cleaning program
serviced 2953 basins.
Stream Floatable Debris Collection Device
eliminated 30% of the floating debris from the City’s
Drainage System. 25 cubic yards of floatables collected
.
Inspection of stormwater outfalls into
Long Island Sound completed.
Design completed for installing drain
valves in Carpenters Pond and Bechmont Lake for future cleaning
and flood mitigation.
Flood Mitigation/Natural Disaster Loss
Reduction Plan developed to establish short and long term
goals for responding to changing conditions of the natural
and built environments, as well as the changing needs of
the City.
Completed Phase II Storm Water Regulations
Management Plan